Vocal Booth and Control Room are level while deliveries of rockwool keep arriving

This is more or less still week one since hired help arrived to complete the first two rooms of the space. The two rooms, known as The Stable and The Kitchen are now the same level as we brought up the control room with a layer of green glue sandwiched between two sheets of yellow tongue. We also mentioned caulking all gaps and making good the floors.

rockwool

Deliveries of insulation starting arriving today (rockwool) and for the first time since the inception of the project it feels like the rooms are going to be too small

Sections of chased walls where previous services lay were (some gas and some electric) have all been filled in with sand cement, no need for commercial flooring guys. So too were the two air vents in the vocal booth (The Stable). Deliveries of stuff keep arriving (massive rolls of insulation today, some rockwool some another kind), and we’re almost certain that by the time we’re finished there will about two square meters of space left. The space is far from looking anything like a recording facility.

gaps in a studio

Regardless of feeling like money is low and we’re short on space, it’s heartening to see any form of development and we’re glad to have the opportunity to document the process while there’s still time to do so. Our builder has assured us that because of the double framing it’s a fairly forgiving process so some of the additional tiling left from the previous room has been left in as can be seen int he image above. Almost 2 skips of waste have already been created from these simple changes.

 

6 responses

  1. The concrete examples make this easier to apply. Readers comparing related resources may also find Dusklight useful in this context.

  2. I appreciated the clear framing here. It connects well with practical web resources such as Poe2 Temple Planner.

  3. I appreciated the clear framing here. It connects well with practical web resources such as Code Veronica Puzzles.

  4. The concrete examples make this easier to apply. Readers comparing related resources may also find Amifat useful in this context.

  5. I like the focus on making small technical tasks simpler. A browser-based utility such as Flee The Facility Values makes sense when installing software would be too much overhead.

  6. Bringing the control room up to the vocal booth’s level with green glue sandwiched between two sheets of yellow tongue shows how much hidden work goes into acoustic construction. The growing piles of rockwool and nearly two skips of waste also make the shrinking usable space feel very tangible. With so many insulation deliveries to identify and organize, a browser-based tool like バーコード作成 無料 could be useful for creating inventory labels.

Leave a Reply

Your email address will not be published. Required fields are marked *